BeiGene Biologics Pharmaceutical Manufacturing Facility Campus – Guangzhou, China

A $300 M USD ground-up campus of 5-story buildings. This fast-track project utilizes cast-in-place concrete for the buildings and central plant. The construction schedule was only 18 months for the entire campus to be ready for equipment installation. This P-3 project was constructed utilizing a C.M. delivery format with both private and public procurement packages. We serve on the project’s executive leadership steering team. As part of this, we are providing a range of services including current and long-range expansion planning, structural engineering peer review, and serving as owner’s rep / trusted adviser.